the dream derives a yacht

Barramundi Asia Boats, Koggola, Sri Lanka


The production of Wild One started in October, 2008.


Basic steps:


1.) Plug: Out of a wooden CNC cut sceletton a male plug - actually a complete hull - is made out of foam stripes screwed to the wooden sceletton. This is then overlaminated first outside and then inside by epoxy vacum infusion.

2.) Mould: Out of the male plug a negative mould is made consisting of a center part and two side parts.

3.) Parts production: Many parts like the setee or the sink been produced off the boat

4.) Infusion of the boat: The mould is layed out with a outer fiber skin - a foam core of Corecell and a inner fiber skin. Then the 3 parts of the hull are infused with epoxy in one go.

helping hands

1.) male plug - Boat 0

2.) negative mould

3.) parts poduction

4.) Infusion

Dec. 2009 Postcuring the hull

Painting

Finetuning, Hardwareinstallation

Feb. 2010: Finish